Operating weeks per year52
Statutory holidays per year12
Operating shifts per day2
Hours per regular shift8.0
Lunch break (min.)30
Shift break (min.)15
Efficiency loss on 3rd shift (%)10
Order file booked (%)90
Dimension changes per shift4
Time to change dimension (min.)8
Operational downtime (%)15
Time waiting on downstream (%)5
Time waiting on upstream (%)5
Avg. FJ block length (m)2.47
End trim for square up (mm)3.175
Lineal feed speed (m/min)100
Stop time for jointing (sec.)0.0
Decel/accel distance (m)0.200
Max FJ infeed blocks per minute40
Finger joint length (mm)23.800
FJ block thickness (mm)38.100
FJ block width (mm)139.700
Eased edge radius (mm)3.175
Min. planer allowance (mm)0.508
Lamella thickness (mm)35.000
FJ RF tunnel glue cure time (sec.)7
Lamella width (mm)136.450
RF tunnel minimum length (m)12
Available hours per year3,968
Production hours per year2,304
Operational readiness (%)58%
Net volume per year (m³)64,426
Volume per available hour (m³)16.2
Volume per production hour (m³)28.0
Fibre loss (m³)8,264
Fibre loss (%)12.8%
FJ blocks per available minute23.2
FJ blocks per producing minute40.0