Lamella width (mm)?Calculates width after removal of eased edge (if applicable).
—
RF tunnel minimum length (m)?Calculated length of an RF tunnel required if resorcinol glue is used.
—
Available hours per year
?
Total hours including breaks (except lunch breaks).
—
Production hours per year
?
Available production hours net of breaks, downtime and lost time due to lack of order file.
—
Operational readiness
?
Equipment availability net of breaks and downtime.
—%
Volume per year (m³)
?
Includes volume that will be lost with square-up and trimming to size on billets, beams or columns.
—
Volume per available hour (m³)?Volume per hour based on total hours available to operate.
—
Volume per production hour (m³)?Volume per hour based on operating hours available (after breaks and downtime).
—
Fibre loss (m³)?Losses for end square-up, fingers and planing to lamella size. Losses for flying cut off saw are not included.
—
FJ blocks per available hour
—
FJ blocks per producing hour
—