CLT Cold Press Production Capacity Calculator

©International Online Expos Inc.
Operating Data (inputs)
%
%
%
%
%
Production Data (inputs)
%
Production Data (outputs)
Billet thickness (mm)
175.000
Lamellae per major layer
25
Lamellae per minor layer
81
Major lamella length (m)
10.925
Minor lamella length (m)
3.275
Layup time per press charge (min.)
4.6
Cure time per press charge (min.)
11.6
Available hours per year ? Total hours including breaks (except lunch breaks).
3,968
Production hours per year ? Available production hours net of breaks, downtime and lost time due to lack of order file.
2,305
Operational readiness ? Equipment availability net of breaks, downtime and lack of order file.
58%
Net volume per year (m³)?Net volume after all trim loss.
27,486
Volume per available hour (m³)?Volume per hour based on total available hours. The total hours are the shift hours not including lunch break.
6.93
Volume per producing hour (m³)?Volume per hour based on production hours available (after breaks and downtime).
11.92
Billets per available hour
1.12
Billets per production hour
1.92
Fibre loss (m³)
1,089
Fibre loss
4.0%